top of page
6MW TecFlo.jpeg

FROM SKETCH TO SCALE

 Delivering a 6MW Liquid Cooling Solution Through Strategic Partnership and Precision Engineering.

OVERVIEW

 What began as a concept on a napkin became a fully engineered 6MW CDU system—designed, built, and delivered through close collaboration with our client and manufacturing partner. This case study highlights MCP’s ownership-driven approach, real-time problem solving, and ability to scale custom solutions in fast-paced, mission critical environments. 

TF ISO View.JPG

CHALLENGE

 The demand for scalable liquid cooling in data centers is accelerating—fast. One forward-thinking customer challenged MCP to help deliver a high-capacity CDU (Coolant Distribution Unit) solution on an aggressive timeline, while minimizing onsite disruptions and maintaining schedule integrity on a live, mission-critical site. 

image002.png

SOLUTION

 To meet an aggressive project schedule and reduce the risk of on-site disruption, MCP implemented a hands-on, collaborative strategy from day one: 

 Early-stage Design Collaboration: MCP worked with TecFlo and the client to develop a fully custom 6MW CDU solution—starting from a rough sketch on a napkin and transforming it into an engineered, buildable system. 

 Integrated Planning Sessions: Hosting key stakeholders onsite during National Data Center Day allowed for live coordination of installation logistics, startup sequences, and commissioning timelines— resolving issues before they became roadblocks. 

 Ownership Mindset in Action: MCP acted as an extension of the client’s team, taking full accountability for schedule adherence, cross-functional communication, and ensuring that every detail was aligned across trades.

IMPACT

This project is a prime example of what can happen when strategic alignment, speed, and technical precision come together. MCP’s collaborative approach not only kept the project on track—it elevated the entire process. By engaging early, adapting quickly, and staying laser-focused on execution, MCP helped deliver a critical infrastructure solution with minimal disruption and maximum efficiency. ​

Accelerated Delivery, Zero Disruption

By aligning early and often with stakeholders - from engineering to install crews - MCP kept a fast-moving project on track without causing downstream delays or disruption to site operations. 

Real-Time Collaboration, Real Results

The on-site working session during National Data Center Day wasn't just symbolic 0 it was tactical. Teams walked away aligned on logistics, minimizing change orders, and keeping the commissioning schedule intact.

Elevating Industry Standards

This project pushed boundaries in the liquid cooling space. By helping design and deliver a 6MW CDU from scratch, MCP enabled a client that's redefining what's possible in high-density, high-efficiency data center cooling. 

bottom of page